Winter home improvement considerations

[ Chinese wardrobe network ] There are many owners and friends who choose to decorate their home in the winter. The winter decoration is not as simple as other seasons. The cold weather has affected the decorative materials to some extent. In the winter decoration, you should pay attention to the following matters:

First, pay attention to the temperature difference

In winter, the indoor and outdoor temperature difference is large. Whether it is wall tile or floor tile, it must be adapted to the indoor temperature to be laid, so as to avoid the phenomenon of empty drums and falling off after construction. In addition, the bricks should be carefully attached to the joints in time.

Second, the paint needs to be kept warm

When the oil painter sprays various coatings, it should be painted strictly according to the temperature in the product description. The ambient temperature of the coating application should not be lower than 5 °C. The ambient temperature of the commonly used mixed color coating should be above 0 °C, varnish. The ambient temperature at the time of application shall not be lower than 8 °C. The decoration and construction shall pay attention to tightly closing the doors and windows to ensure that the indoor temperature is at least 5 °C, especially the oil work, pay attention to "warm", and then open the doors and windows after sufficient drying. In the construction site where the temperature does not meet the requirements, electric heating should be provided to ensure the quality of the project.

Third, prepare the main material in advance

The main materials used in the decoration, especially the wood, should be prepared in advance, preferably in the room with heating equipment for 3 to 5 days to volatilize the moisture generated by the temperature change, so that the moisture content of the wood is close to the level of the house. In order to avoid deformation after renovation.

Fourth, put a good antifreeze

The sand should be carefully screened and there should be no ice. The construction personnel should properly add the antifreeze according to the actual construction requirements. When the mortar is stirred, the temperature of the water should not exceed 80 °C. The maintenance time should be extended with the use of the bricklayer to extend the curing time of the bricklayer construction for 48 hours to 72 hours. Cement can not be used in the open air, and it is necessary to prevent freezing.

Five, putty avoid too thick

Putty can't be too thick. Because the indoor air is dry, the water loss is faster, otherwise it will easily cause empty drums, cracks, and wall inequality. Therefore, the putty is best to be thin and uniform each time, and each time it is necessary to dry naturally and then scrape off a layer, so that it is not easy to appear empty and cracking.

  • Ergonomic Design: The comfortable new trends of coating for  body shape and superior calibrated tension ensure that these tweezers are easy to hold, close evenly and firmly to grip every hair precisely every time
  • Durable quality: Features a durable, easy to clean classic 430 stainless steel design
  • These tweezers are made with perfectly aligned, hand-filed flated tips for expert precision
  • We promise these are the most precise, perfectly aligned, highest gripping, longest lasting, beautiful tweezers you will ever use
  • Customized designs are welcom
stainless steel tweezers

Stainless Steel Tweezer

Stainless Steel Tweezer,Stainless Tweezers,Stainless Steel Eyebrow Tweezers,Stainless Steel Tweezer Set

Bonet Houseware Co., Ltd. , https://www.bonetbt.com